Framing continued on as the floors in our house kept going up. One of the last things to be framed was our garage.Probably the coolest part though was seeing the third floor get framed because it was the hardest thing to visualize during design phases because of all the peaks of the roof. And after framing, our roof sheathing and shingles went on.
Note: this blog is just a small recap of our journey. For more detailed posts and daily updates on our house building journey, please follow us on our Instagram page and for sources go to our homepage.
Leave a Reply
You must be logged in to post a comment.